  • Every three years, the National Electric Code, or NEC, receives new revisions to keep the Code up to date and keep electricians safe while they're on the job. More than 3,700 proposals were submitted in 2011. Each of them were reviewed by the NPA Code-Making Panels and Technical Committee to bring about the 2014 changes. Below are some of the noteworthy changes:
  • The nominal threshold voltage was increased from 600 Volts to 1,000 Volts. The higher voltage is needed for the installation for solar PV equipment.
  • New Articles were added to the NEC topics concerning:
    • Article 393 Low Voltage Suspended Ceiling Power Distribution
    • Article 646 Modular Data Centers
    • Article 728 Fire Resistive Cable Systems
    • Article 750 Energy Management Systems
  • The definition of "readily accessible" has been added to article 100. (Readily Accessible: Capable of being reached quickly for operation, renewal or inspection without requiring those concerned to use a tool, to climb over, remove obstacle or other.)
  •  Article 210.12 AFCI Protection for Dwelling Units now required in kitchen, laundry and dormitories. 
  • There is a revision in Article 445.11 to require marking at generators to indicate if the neutral is bonded to the frame.
  • There was a revision to article 406.9(B)(1) Extra-Duty Covers at 15- and 20-Ampere for receptacles at wet locations.
  • Articles 517.18(B); 517.19(B); and 517.19(C) for healthcare facilities will conform to NFPA 99 and change the number of receptacles in patient care facilities for the patient and in operating rooms.
  • Article 690.12 will require Rapid Shutdown of PV Systems on Buildings.


To read these noteworthy changes in more detail, visit: http://www.ieci.org/codes-and-standards/2014_nec_changes
2 Comments
cbe smart interiors link
4/25/2014 09:14:58 pm

smart interiors - one of the best modular kitchen service providers in coimbatore. They provide aluminium modular kitchen with cheap price and quality service provider in the field of modular kitchen in coimbatore.

Reply
Gabriel link
2/11/2021 01:49:02 pm

Greaat reading your post

Reply



Leave a Reply.

    Categories

    All
    Community
    Lighting
    News
    Recipes
    Safety
    Tips

    Archives

    April 2020
    October 2017
    September 2017
    August 2017
    June 2017
    May 2017
    February 2017
    January 2017
    December 2016
    October 2016
    September 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    October 2015
    September 2015
    August 2015
    July 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    January 2015
    December 2014
    November 2014
    October 2014
    September 2014
    August 2014
    July 2014
    June 2014
    May 2014
    April 2014
    March 2014
    February 2014
    January 2014
    December 2013
    November 2013
    October 2013
    September 2013
    August 2013
    July 2013
    June 2013
    May 2013
    April 2013
    March 2013

    RSS Feed



Home


About Us


Our Services


Service Area
 Copyright © 2019. Griff's Electric, Inc.
  • Home
  • About Us
    • Our Misson and Vision
    • Our Team
    • Projects
  • Our Services
    • Medical
    • Commercial
    • Industrial
  • Service Area
  • Contact Us
    • Request Service Call
    • Request Bid/Quote
  • Photo Gallery